{"events":[{"jurisdiction_url":"https://api.open511.gov.bc.ca/jurisdiction","url":"https://api.open511.gov.bc.ca/events/drivebc.ca/RIDE-100086","id":"drivebc.ca/RIDE-100086","headline":"CONSTRUCTION","status":"ACTIVE","created":"2026-06-24T20:50:57-07:00","updated":"2026-06-27T14:34:35-07:00","description":"Bridge construction. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. Work began on December 1st, 2025.","+ivr_message":"Bridge construction at Highway 7B, In Port Coquitlam and Between United Blvd and Shaughnessy St. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Last update: June 27th, 2026 at 2:34pm. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. Work began on December 1st, 2025.","+linear_reference_km":0,"schedule":{"intervals":["2025-12-01T15:00/"]},"event_type":"CONSTRUCTION","event_subtypes":["PLANNED_EVENT"],"severity":"MAJOR","geography":{"type":"Point","coordinates":[-122.80629401,49.22696838]},"roads":[{"name":"Highway 7B","from":"Mary Hill Bypass","direction":"BOTH","state":"ALL_LANES_OPEN"}],"areas":[{"url":"http://www.geonames.org/8630136","name":"Lower Mainland District","id":"drivebc.ca/1"}]}],"pagination":{"offset":"0"},"meta":{"url":"/events/drivebc.ca/RIDE-100086","up_url":"/events","version":"v1"}}